As a result we installed 90kWp off Hanwah Qcells to the roof spaces. The Panels are mounted to a rail system fixed to the rafters, the tiles are then notched out and placed back onto the roof around the mounting points so that the sit down flush to the roof and the other tiles.
The solar system installed is fully optimised with Solar Edge frame mounted optimisers and connected to Solar Edge 80kWp 3 phase solar inverter installed in the roof space below.
The complete solar install took just over 2 weeks to install and sign off and the customer is now supplying green solar energy to the residents of the complex.