As a result Blue Sun Energy Ltd installed one 22kWp 3 Phase PV system to the Farm buildings at the site and a smaller 5kWp solar PV system tp the farm house along with a LiFePo4 battery storage system to cover the farm house consumption during the night.
This install took a total of 4 days and the customer was extremely pleased with the end result that produces more than enough solar power for the Farm house.